St. Albans Glass was successful in a competitive process to win the Design Assist Contract for Burlington City Place. This 14-story landmark building located in the heart of downtown Burlington features Peerless and Kawneer products.

What about the glass?
This project will utilize the 2500 UT Unitwall™ System from Kawneer and Vitro Solarban 70 XL Low E Glass.

Highlights Include:
Ultra Thermal Design - Designed to exceed all current energy codes
Patent Pending Thermal Design - Innovative design provides modular design functionality
With window and door systems from Peerless.

Highlights Include:
In-Swing Casement Windows
Terrace Doors
Who's working on it?
Project Executive: Greg Swan
Sr. Project Manager / Estimator: Jason Butler
Operations Manager / Field Project Manager: Erik Spooner
Project Manager: Glen Branon
Projected Completion Date: Spring 2021